The studio is the pipeline.
- 01 · Senior architects
Specify
The PRD is authored — not transcribed — by senior solution architects. Every flow, edge case, and failure mode is resolved on paper before code begins. No stub text. No 'we'll figure it out later.' If the PRD doesn't survive a 90-minute architectural stress-test, it doesn't ship.
Artifacts shipped- Full PRD with all flows + schemas
- Architectural simulation results
- Identified risks + mitigations
- Signed-off scope
- 02 · Designers + agents
Design
Senior designers author the visual system once. AI agents extend icon sets, generate variants, and render clickable HTML prototypes in minutes — three full visual passes become cheap. The prototype is the spec; mobile engineers consume it directly. No Figma-to-code translation loss.
Artifacts shipped- Locked visual system + tokens
- Clickable HTML prototype (all flows)
- Three visual passes
- Senior-designer review
- 03 · Agents + senior engineers
Orchestrate
AI agents execute against architect-authored specifications: CRUD volume, data migrations, admin screens, form flows, test fixtures. Each PR carries the spec, the diff, and the test suite. A senior human reviews and merges. Pair programming via agents for high-stakes modules.
Artifacts shipped- Spec-driven PRs
- TDD-first implementation
- Reviewed and merged daily
- Architect approval on schema + security
- 04 · QA + browser agents
Verify
Every service has E2E coverage: happy path, error paths, auth boundaries, rate limits. Browser-agent scripts drive the app across every golden path. Screenshot diffs catch visual regressions; action replays catch behavioural ones. A human QA engineer runs the full release checklist end-to-end on real devices before any gate closes.
Artifacts shipped- E2E API + backend tests
- Browser-agent regression suite
- OWASP top-10 security pass
- Final manual QA on real devices
- 05 · CI/CD + program management
Ship
GitHub Actions auto-deploy every merged PR through dev → staging → prod. Two-week sprints with standup, planning, retro. Gate reviews every Friday with the client. Change requests routed transparently — never quietly absorbed. Milestones either close cleanly or they don't close.
Artifacts shipped- Auto-deploy on green main
- Weekly client gate reviews
- UAT volunteers per gate
- Milestone-linked invoicing
Tell us what you’re building.
We work with a small number of teams at a time. If you have a thesis, a constraint, and a deadline that legacy partners are quoting in quarters — we want to hear about it.
We respond within one working day.